HubSpot to Salesforce Migration — Implementation

Project One-Pager

Quick reference for architects. One per project type. Fill this out FIRST — it serves as the project's identity card.

HubSpot to Salesforce Migration One-Pager

Project Type

  • Category: Technical
  • Primary Deliverable: Fully configured Salesforce instance with migrated data, automations, layouts, and connected third-party tools
Phase Relevance
PhaseApplies?WeightNotes
1. StrategyYesLight~30 days of scoping; The Big Five decisions + workback plan
2. EngineeringYesHeavyField mapping, automations, layouts, data migration, integrations
3. EnablementYesLightEnd user + admin training, 2-4 weeks hypercare
4. HandoffYesLightInternal + External handoff, transition to steady-state

Phase Overview

  ┌──────────────┐     ┌──────────────┐     ┌──────────────┐     ┌──────────────┐
│ 1. STRATEGY │────▶│ 2. ENGINEER │────▶│3. ENABLEMENT │────▶│ 4. HANDOFF │
│ Light │ │ Heavy │ │ Light │ │ Light │
│ 1a→1b→1c→1d │ │ 2a→2b→2c→2d │ │ 3a→3b→3c→3d │ │ 4a→4b→4c→4d │
└──────────────┘ └──────────────┘ └──────────────┘ └──────────────┘
~30 days scoping Field mapping, End user + admin Internal + External
Big Five decisions automations, data training, 2-4 wk handoff, steady-state

This project's flow:

  • Full 4-phase. Light strategy (scoping-focused), heavy engineering (60-80% of effort), light enablement, standard handoff.
  • No phases skipped. Phase 2 is the bulk of the project (~150 hours standard, 350-400 for mergers).
  • Phase 1 runs ~30 days before engineering begins. Salesforce license needed by start of Phase 2c.

Pre-Kickoff (1a)

Track A: Customer Homework
  • Provide admin access to HubSpot instance
  • Complete inventory of connected third-party tools (Gong, Salesloft, Outreach, ChurnZero, etc.)
  • Identify key decision-makers for architecture decisions
  • Gather any existing documentation on current HubSpot setup (workflows, lifecycle stages, custom objects)
Track B: Architect Prep
  • Gain admin access to HubSpot and begin initial inventory (fields, workflows, integrations)
  • Review current HubSpot field structure per object (contacts, companies, deals)
  • Identify scope signals: data volume, custom objects, third-party tool count
  • Draft initial scoping questions for kickoff based on inventory findings

Refinement Loop (1b → 1c → 1d)

MeetingSub-PhaseFocusStakeholderOutput
Kickoff1bEstablish timeline, scope, working relationshipArchitect + Client leadsInitial scoping direction
Scoping 11cAccounts + Opportunities architectureArchitect + ClientAccount/Opp decisions documented
Scoping 21cContacts/Leads architecture + lead lifecycleArchitect + ClientContact routing + lifecycle design
Scoping 31cTechnology strategy + data structure decisionsArchitect + ClientThird-party one-pagers, ETL/ELT decision
Workback Review1cReview workback plan, align on milestonesArchitect + ClientApproved workback plan
Sign-Off1dConfirm all Big Five decisions, approve build planAll stakeholdersStrategic sign-off to begin build

Cadence: Two meetings per week during scoping phase.

Phase Checklists

Phase 1: Strategy
  • 1a. Pre-Kickoff complete (HubSpot access + initial inventory)
  • 1b. Kickoff call held
  • 1c. All Big Five categories scoped (Accounts, Opportunities, Contacts/Leads, Technology, Data Structure)
  • 1c. ETL vs ELT approach decided
  • 1c. Contacts-to-Leads architecture decided (lead-based vs contact-only)
  • 1c. Workback plan created and reviewed
  • 1d. Strategic sign-off obtained — ready for engineering
Phase 2: Engineering
  • 2a. Tech spec created (field mapping docs + automation specs)
  • 2b. Engineering handoff meeting held (Architect → Engineer)
  • 2c. Field mapping & data audit complete (per object)
  • 2c. Automations & workflows built (including The Hits)
  • 2c. Layout design & UX configured
  • 2c. Data migration executed
  • 2c. Third-party tools installed and connected
  • 2d. QA complete (10-item checklist) + launch/cutover executed
Phase 3: Enablement
  • 3a. Training materials prepped (workflow docs, admin guides)
  • 3b. End user training delivered
  • 3b. Admin training delivered
  • 3c. Hypercare period complete (2-4 weeks)
  • 3d. Enablement sign-off — team operating independently
Phase 4: Handoff
  • 4a. Maintenance schedule documented
  • 4b. Internal handoff complete
  • 4c. External handoff (LeanScale → Customer) complete
  • 4d. Project closed and archived

Document Types

Working Documents (iterate together)
DocumentPurposeWhen Complete
Field Audit SpreadsheetsPer-object field analysis and migration actionAll fields reviewed, client decisions captured
Workback PlanMilestone tracking, dependencies, deadlinesAll milestones listed, timeline agreed
Scoping Documents (Word/Docs)Architecture decisions for The Big FiveAll five categories decided
Third-Party Tool One-PagersPer-tool migration strategyStrategy documented for every connected tool
Deliverables (polished outputs)
DeliverableCreated FromCustomer Uses For
Fully configured Salesforce instanceField audits + scopingDaily CRM operations
Data migration (historical preserved)Field mapping + ETL workContinuity of business records
Connected third-party integrationsTool one-pagersSales/marketing tool ecosystem
Architecture diagrams (Lucidchart)Scoping documentsInternal documentation

Enablement Details

Training Types
TypeAudienceFocusDuration
End UserSales reps, marketing, CSNavigate new Salesforce UI, complete common tasks, key workflow changes60 min
AdminRevOps, Salesforce adminSystem management, workflow maintenance, troubleshooting, field/layout changes60-90 min
Hypercare
  • Applies: Yes
  • Duration: 2-4 weeks post-launch
  • Office Hours: Yes — reactive support for issues, scheduled availability
Training Assets to Create
  • Video walkthrough: End user walkthrough of new Salesforce instance
  • Video walkthrough: Admin training on system management and maintenance
  • Doc: Key process and workflow documentation
  • Doc: Field mapping reference (what moved where)

Handoff & Retention

Internal Handoff
  • Key context for Architect: Architecture decisions made (Big Five), any edge cases or client-specific workarounds, list of third-party tools and cutover status
  • Escalation trigger: Any structural changes to object architecture, workflow logic modifications, new third-party tool integrations
External Handoff (LeanScale → Customer)
  • Final meeting agenda: Confirm all data migrated, review key workflows, walk through new UI/UX, confirm all third-party tools connected, set expectations for post-hypercare steady-state
  • Documentation package: Field audit spreadsheets, scoping documents, training recordings, workflow documentation
Maintenance Schedule
  • Post-hypercare: Transition to steady-state operations with standard ongoing optimization as needed
  • Who owns: Single project = customer owns | Dedicated = Architect owns
Retention/Expansion Path

If Single Project: Upsell: Managed Services → if no → Downsell: Adjacent project (Attribution, Lead Lifecycle, Deduplication, CPQ) → Retry retainer

If Multi-Project (Dedicated):

  • Refinement check-in scheduled: ~1 quarter post-launch
  • Internal prep trigger: 2 weeks before
  • Decision: Architect handles / Engineer needed

Definition Alignment Terms

TermTypical Definition
Lead (Salesforce)A person who has expressed interest but is not yet associated with an Account/Opportunity
Contact (Salesforce)A person attached to an Account — typically post-conversion from Lead
Contact (HubSpot)A single object representing both leads and contacts — no Lead/Contact split
ConversionThe act of turning a Salesforce Lead into a Contact + Account (+ optionally Opportunity)
The Big FiveThe five object categories scoped in every migration: Accounts, Opportunities, Contacts/Leads, Technology, Data Structure
ETLExtract, Transform, Load — transform data before loading into Salesforce
ELTExtract, Load, Transform — load data as-is into Salesforce, transform after
The HitsFoundational automations included in every migration (timestamps, conversion checkboxes, renewal infrastructure, etc.)
Workback PlanMilestone-based planning document listing all deliverables, decisions, and dependencies with deadlines
Hypercare2-4 week period of intensive post-launch support for issue resolution and system stabilization

Common Gotchas

  • ELT complications — Going ELT can cause downstream issues. The time saved upfront can be lost in post-load cleanup. → Use ETL approach when possible; only go ELT if timeline truly requires it.
  • Third-party tool cutover timing — Sales engagement tools (Salesloft, Outreach) have very tight cutover windows. Disconnect HubSpot too early = missing data. Connect Salesforce too late = missing data. → Plan cutovers precisely with just-in-time strategy. Identify which tools can go early vs which must be cut over at launch.
  • Unexpected workflow behavior in production — Even with thorough QA, some workflows behave differently with real user data at scale. → Plan for hypercare support period; treat it as expected, not optional.
  • Historical data transformation decisions — Deciding what to do with historical anomalies (multiple opps per renewal, conflicting picklist values, dead fields) can be contentious and time-consuming. → Address during field audit and scoping phases (Phase 1c/2c). Don't defer these to migration day.
  • Attribution over-engineering — Scope creep on attribution during migration can consume disproportionate hours. → Gauge appetite during scoping. Basic attribution = part of The Hits. Deep attribution = separate project.

Methodology Options

OptionWhen to UseComplexity
ETL (recommended)Cleanup needed, budget allows, standard timelineMedium
ELTTight timeline or constrained budgetHigh (downstream risk)
Lead-based (recommended)Most scenarios (~14 of 15 customers)Medium
Contact-onlyVery rare; tight data universe control requiredHigh (Gmail signups problematic)

Phase 1: Strategy

Goal: Get stakeholder sign-off on architecture decisions across The Big Five before building anything.

Output: Scoping documents (Word/Docs), architecture diagrams (Lucidchart), data mapping spreadsheets, workback plan — all signed off by client stakeholders.

1a. Pre-Kickoff

Two parallel tracks run after the deal closes and before the kickoff call.

Track A: Customer Homework

What we send:

ItemPurposeFormat
Access requestGrant admin access to HubSpot instanceEmail
Third-party tool inventory requestComplete list of all connected toolsSpreadsheet/Email
Stakeholder identificationIdentify decision-makers for architecture choicesEmail

Completion tracking: Follow up on HubSpot admin access immediately — this is the critical-path blocker. Without access, inventory cannot begin.

Track B: Architect Prep

What the Architect does:

StepActionOutput
1Gain admin access to HubSpot instanceAccess confirmed
2Begin initial inventory — fields per object, active workflows, integrationsRaw inventory data
3Identify scope signals — data volume, custom objects, tool countInitial complexity estimate
4Review for merger indicators (multiple instances, conflicting schemas)Standard (~150 hrs) or merger (~350-400 hrs) estimate
5Draft scoping questions based on inventory findingsKickoff meeting prep

Critical: This is reconnaissance, not decision-making. Inventory first, scope second.


1b. Kickoff Call

Purpose: Establish the working relationship and begin scoping The Big Five.

Agenda (60 min)

TimeTopicWhat Happens
0-15Introductions + project overviewEstablish timeline expectations, overall scope, roles
15-30Migration driversWhat's driving the move? (Data visibility, usability, Salesforce comfort)
30-45Initial scoping discussionBegin collecting info on The Big Five categories
45-60Next stepsSet meeting cadence (2x/week), assign homework

What We Bring

  • Initial HubSpot inventory findings
  • Scoping questions drafted from inventory review
  • High-level project timeline estimate

What We Leave With

  • Understanding of migration drivers and priorities
  • Initial direction on accounts and opportunities architecture
  • Client-side stakeholder map and decision authority
  • Confirmed meeting cadence (two meetings per week)

1c. Alignment Loop & Strategic Meeting Cadence

Purpose: Scope all five categories of The Big Five and create the workback plan. This is the structured decision-making phase.

The Pattern

Kickoff (gather context)

Scoping Meeting 1: Accounts + Opportunities

Scoping Meeting 2: Contacts/Leads + Lead Lifecycle

Scoping Meeting 3: Technology Strategy

Scoping Meeting 4: Data Structure + Workback Plan Review

Sign-Off Meeting: Approve all decisions, begin engineering

Cadence: Two meetings per week. First ~30 days are primarily scoping-focused before build begins.

The Big Five Scoping Sequence

Category 1: Accounts Architecture

  • Review current HubSpot company structure
  • Define Salesforce account hierarchy needs
  • Typically the least controversial object
  • Output: Account architecture documented

Category 2: Opportunities Architecture

  • Review current HubSpot deals structure
  • Map to Salesforce opportunity stages
  • Address transformation needs (e.g., consolidating multiple renewal/expansion opps)
  • Output: Opportunity architecture documented

Category 3: Contacts/Leads Architecture (the noteworthy one)

  • HubSpot has one Contact object. Salesforce has separate Lead and Contact objects. This is not 1:1.
  • Decide: Lead-based (recommended, ~14 of 15 customers) vs Contact-only (rare)
  • If lead-based: Design lead lifecycle and statuses, conversion triggers, creation flows
  • If contact-only: Must have tight data universe control. Gmail/personal email signups have nowhere to go (no Google account to attach to). May need "orphanage" accounts as workaround.
  • Output: Contacts/Leads architecture + lifecycle design documented

Category 4: Technology Strategy

  • Inventory all third-party tools connected to HubSpot (Gong, Salesloft, Outreach, ChurnZero, CPQ tools, data enrichment, etc.)
  • For each tool, create a one-pager: current state, migration strategy (reconnect, replace, or deprecate), timeline, dependencies
  • Identify just-in-time cutover tools (Salesloft — too early = missing data, too late = missing data)
  • Identify tools that can be built early (CPQ — net-new in Salesforce, doesn't replace existing)
  • Check if client has negotiated migration support in vendor contracts
  • Output: One-pager per tool

Category 5: Overall Data Structure

  • Decide ETL vs ELT approach (ETL recommended — transform before loading. ELT can cause complications.)
  • Determine transformation scope — how much cleanup during migration vs lift-and-shift
  • More transformation = more hours but better end state
  • Output: Data structure decisions documented

Workback Plan Creation (parallel with scoping)

The workback plan is created during scoping and evolves as decisions are made.

  • Create workback plan document (Excel/Sheets or Gantt-style)
  • List all milestones needed to deliver project on time
  • Include decision deadlines and deliverable deadlines
  • Include team/license needs by date (Salesforce license needed before Phase 2c)
  • Include dependencies between items
  • Typical size: 25-30 items (not 160+ like merger examples)
  • Review workback plan with client — get alignment on timeline and milestones
  • Update as scope evolves (e.g., CPQ evaluation added when decision is made)

1d. Strategic Sign-Off

Purpose: Confirm all Big Five decisions are made and documented before proceeding to engineering.

Validation Checkpoint

  • All five categories of The Big Five scoped and documented
  • ETL vs ELT approach decided
  • Contacts-to-Leads architecture decided (lead-based vs contact-only)
  • Lead lifecycle designed (if lead-based)
  • Third-party tool strategy documented (one-pager per tool)
  • Workback plan reviewed and approved by client
  • Salesforce license confirmed available (required for Phase 2c automations build)
  • No blockers for engineering

Decision Point

  • Proceed to Engineering → All scoping complete, license available, build can begin

Phase 2: Engineering

Goal: Build and configure the Salesforce instance per approved scoping decisions.

Output: Fully configured Salesforce instance — fields mapped, automations built, layouts configured, data migrated, third-party tools connected, QA passed.

Project TypeEngineering WeightThis project
Engineering-heavyHeavy (60-80%)Field mapping, automations, layouts, data migration, integrations — this is the bulk of the work

Sub-Phases

2a Tech Spec → 2b Engineering Handoff → 2c Build → 2d QA/Test + Launch

2a. Tech Spec

Purpose: Translate scoping decisions into technical specifications — the bridge between strategy and build.

Input: Signed-off scoping documents, architecture diagrams, workback plan from Phase 1

What happens:

  1. Create field audit spreadsheet for each core object (Accounts, Opportunities, Contacts/Leads)
  2. Per-field documentation:
    • Field name, field type, fill rate, last updated date
    • How it's primarily updated (manual, workflow, calculated, integration)
    • Is it a standard field created by the system?
    • Is it used in workflows? (If we delete it, will it break other things?)
    • Picklist options if applicable (what are all the options, do we want to keep all of them?)
  3. Analyze each field for migration decision: Keep as-is / Transform / Delete
  4. Document data transformation needs (duplicates, junk data, historical anomalies)

Key priorities during field analysis:

  • Minimize multi-picklist fields (causes reporting issues)
  • Minimize free-text fields (causes sustainability issues)
  • Identify duplicates to merge
  • Identify junk data to exclude from migration

Key insight:

"If they have 500 fields in HubSpot, we're not going to lift and replace. We want to analyze: Are these fields actually being used? Are they providing value? Is there anything funky about the data structure itself?"

Output: Field audit spreadsheets per object with migration decisions documented


2b. Engineering Handoff

Purpose: Transfer scoping context and tech specs from Architect to Engineer before build begins.

Who attends: Architect + Engineer

Agenda (30-45 min):

TimeTopicWhat Happens
0-15Walk through scoping decisionsArchitect explains The Big Five decisions, architecture diagrams, and client context
15-30Review field audit docsWalk through field-by-field migration decisions per object
30-45Build sequence and dependenciesConfirm order of operations, flag risks, agree on approach

What Architect brings:

  • Scoping documents and architecture diagrams
  • Field audit spreadsheets with migration decisions
  • Workback plan with build milestones
  • Third-party tool one-pagers with cutover timelines

What Engineer leaves with:

  • Full context on architecture decisions and client priorities
  • Clear field-by-field build instructions
  • Build sequence aligned to workback plan
  • Known risks and dependencies

2c. Build (Configure)

Purpose: Build the Salesforce instance — field mapping, automations, layouts, data migration, and integrations.

Input: Approved field audits and scoping decisions from 2a/2b

Salesforce license is REQUIRED from this point forward.

The build phase covers five parallel/sequential workstreams:

Workstream 1: Field Mapping & Data Strategy Execution

  1. Review field audit with client — walk through recommendations, get client decisions on each field
  2. Create tasks for each transformation (delete these fields, merge these fields, transform these picklist values, clean up these records)
  3. Execute field transformations per approved decisions

"This is the tricky part of the 'T' in ETL. This is going to be the best time to do any transformational work because you're already introducing disruption."

Common forks at this stage (may spawn adjacent projects):

  • GTM Lifecycle / Lead Lifecycle project
  • Deduplication project
  • Tool evaluation (CPQ, attribution depth)

Workstream 2: Automations & Workflows Build

  1. Audit existing HubSpot workflows — document all active workflows, identify which need recreation, which are no longer needed
  2. Build "The Hits" (Foundational Automations):
    • Timestamps for stage movement and velocity tracking (leads and opportunities)
    • Conversion checkboxes
    • Stage timing workflows for documenting customer lifecycle events
    • Renewal infrastructure (automatic generation of recurring revenue renewals)
    • ACV/TCV calculations
    • Increase/expansion tracking fields
    • Commission-related fields
    • Attribution fields (basic setup — gauge appetite; deep attribution is a separate project)
  3. Build client-specific workflows — recreate necessary HubSpot workflows in Salesforce, implement new workflows identified during scoping
  4. Build conversion flows (if lead-based approach) — Lead-to-Contact conversion process and related automation triggers
  5. Document all automations built

Warning: Basic attribution = part of The Hits. Full attribution with operational depth = separate project. Gauge appetite during scoping to avoid scope creep.

Workstream 3: Layout Design & UX Configuration

  1. Design page layouts for each object (Accounts, Contacts, Leads, Opportunities)
  2. Configure record types if needed
  3. Build Lightning pages and components
  4. Configure list views and reports
  5. Test user experience flows

Workstream 4: Data Migration

  1. Prepare data extraction from HubSpot — export all records, apply transformations per ETL approach
  2. Prepare Salesforce for import — ensure target fields exist, configure validation rules
  3. Perform test migration — import subset, validate accuracy, test workflows fire correctly
  4. Execute full data migration — import all records, maintain relationships, preserve historical data
  5. Validate data migration — spot check records, verify record counts, confirm relationships intact

Workstream 5: Third-Party Tool Installations

  1. Install and configure tools that can go early (CPQ tools, new tools not replacing existing)
  2. Plan cutover timing for just-in-time tools
  3. Execute just-in-time tool cutovers at launch (disconnect HubSpot, connect Salesforce, data backfills if needed)
  4. Validate all integrations (test data flow, confirm functionality)

2d. QA / Test + Launch & Cutover

Purpose: Verify the build works, then execute go-live.

QA Checklist (10 Items)

#CheckPass?
1All field mappings accurately transferred[ ]
2Data record counts match expectations[ ]
3No orphaned records (contacts without accounts in Salesforce)[ ]
4All workflows triggering correctly[ ]
5Lead conversion process working (if lead-based approach)[ ]
6All third-party integrations connected and flowing data[ ]
7User permissions configured correctly[ ]
8Reports and dashboards populated accurately[ ]
9Historical data preserved appropriately[ ]
10No duplicate records created during migration[ ]

Industry context: CRM implementation projects have a 47-55% failure rate when measured against planned objectives. The QA phase directly addresses the most common failure driver — migrating dirty or mismatched data without validation.

Launch & Cutover

  1. Final QA pass — test all workflows, integrations, user access/permissions
  2. Coordinate cutover timing — align on go-live date, plan for minimal disruption
  3. Execute cutover — make Salesforce system of record, complete remaining just-in-time tool cutovers
  4. Communicate launch to end users — announce go-live, provide access credentials/instructions

Engineering Sign-Off Checkpoint

  • All QA checklist items passing
  • Salesforce is system of record
  • All third-party tools connected and validated
  • Data migration complete and verified
  • Ready for enablement

Decision point:

  • Proceed to Enablement → System is live, needs training and hypercare
  • Loop back to Build → Critical issues found, needs fixes before go-live

Phase 3: Enablement

Goal: Customer team can use the new Salesforce instance effectively.

Output: Trained team with documentation, stabilized system through hypercare, no critical issues outstanding.

Sub-Phases

3a Training Prep → 3b Training Sessions → 3c Hypercare → 3d Enablement Sign-Off

3a. Training Prep

Purpose: Prepare training materials based on the specific build delivered.

Input: Completed Salesforce build + scoping documents + workflow documentation

What happens:

  1. Identify training audiences (end users vs admins)
  2. Create training agenda for each audience
  3. Prepare walkthrough scripts covering key workflows and daily-use patterns
  4. Document key process changes from HubSpot to Salesforce (what moved, what's different)
  5. Prepare FAQ based on common questions from similar migrations

Output: Training package containing:

  • End user training agenda and walkthrough script
  • Admin training agenda covering system management
  • Process change documentation (HubSpot → Salesforce differences)
  • FAQ draft

3b. Training Sessions

Purpose: Transfer knowledge to customer team so they can operate in the new system.

Two types of training:

TypeAudienceFocusDuration
End UserSales, marketing, CSNavigate new Salesforce interface, complete common tasks, understand key workflow changes60 min
AdminRevOps, Salesforce adminSystem management, workflow maintenance, troubleshooting, how to make field/layout changes60-90 min

Training delivery:

  1. Schedule sessions with appropriate stakeholders
  2. Deliver training (live — record for future reference)
  3. Record video walkthroughs for async access
  4. Answer questions, note gaps for FAQ updates

Output:

  • Trained end users and admins
  • Recordings of training sessions
  • Updated FAQ with questions raised during training

3c. Hypercare

Purpose: Intensive post-launch support to stabilize the system with real production data.

Duration: 2-4 weeks post-launch

Industry context: Hypercare periods of 2-8 weeks post-launch are standard for CRM implementations, with dedicated resources for real-time monitoring and rapid issue resolution. For migrations specifically, the 2-4 week window is appropriate for standard complexity.

What happens:

  • Reactive support for issues that arise in production
  • Patch things that don't behave as expected with real user data at scale
  • Address edge cases discovered with production data
  • Monitor workflows for unexpected behavior
  • Fine-tune automations based on user feedback
  • Document all fixes and adjustments made

"One day we'll get a migration that doesn't have anything that needs to be fixed. The day that we do, it will be the first."

Hypercare is not optional for migrations. Technical projects at this complexity need it. The question is duration, not whether to do it.

Output: Stabilized system, all critical issues resolved, fixes documented


3d. Enablement Sign-Off

Purpose: Confirm customer team can operate the new Salesforce instance independently.

Validation Checkpoint

  • End user training delivered and recorded
  • Admin training delivered and recorded
  • Hypercare period complete (2-4 weeks)
  • All critical issues discovered during hypercare resolved
  • Customer team can operate without daily LeanScale support
  • Training recordings and documentation provided
  • Ready for handoff

Decision Point

  • Proceed to Handoff → Customer is enabled, system is stable, project wrapping up
  • Extend Hypercare → Still unstable, needs more support time

Phase 4: Handoff

Goal: Clean project close with maintenance plan established and retention/expansion path set.

Output: Maintenance expectations documented, internal context transferred, customer owns the system, project archived, future revenue path established.

Structure:

4a Maintenance Schedule → 4b Internal Handoff → 4c External Handoff → 4d Project Close

Maintenance ownership by engagement type:

Engagement TypeWho Owns MaintenanceHanded Off At
Single ProjectCustomer owns4c (External Handoff)
Dedicated (Multi-Project)Architect owns4b (Internal Handoff)

4a. Maintenance Schedule

Purpose: Document what needs ongoing attention after hypercare ends.

Post-Hypercare Monitoring

A CRM migration is a one-time project, but the system requires ongoing attention to prevent drift. After hypercare, the system transitions to steady-state operations.

Monthly Tasks:

Monthly TaskWhat to CheckRed Flag Threshold
Workflow health checkAll automations triggering correctly, no error logsAny workflow failures or unexpected triggers
Data quality spot checkDuplicate records, orphaned contacts, fill rate driftDuplicate rate exceeding pre-migration baseline
Integration monitoringAll third-party tools syncing correctlyAny sync failures or data gaps

Quarterly Tasks:

Quarterly TaskWhat to ReviewAction if Off-Track
User adoption reviewLogin frequency, record update rates, feature usageAdditional training if adoption declining
Field utilization auditAre new fields being used as intended?Deprecate unused fields, adjust layouts

Refinement Triggers (when to re-engage):

TriggerThresholdResponse
Workflow failuresRecurring failures in productionRe-engage Engineer for diagnosis
New tool integration neededClient adds new tool requiring Salesforce connectionScope as new mini-project
Data quality degradationDuplicate rate or junk data rising significantlyScope deduplication project

4b. Internal Handoff

Purpose: Transfer project context so Architect can manage ongoing relationship.

What the Architect needs to know:

  • Architecture decisions made (The Big Five outcomes)
  • Client context — key stakeholders, decision-making style, any sensitivities
  • Third-party tool ecosystem and cutover status (all tools, their status, any ongoing considerations)
  • Common issues seen during hypercare and how they were resolved
  • When to escalate back to Engineer

Escalation guidelines:

Issue TypeWho HandlesExample
Small tweaks, minor questionsArchitectField label changes, report filter adjustments
Significant changes, complex issuesArchitect/EngineerObject architecture changes, new workflow logic, new integrations

For Dedicated engagements: Architect also receives the maintenance schedule (4a) and becomes responsible for executing it.


4c. External Handoff (LeanScale → Customer)

Purpose: Formal project completion with customer.

Final Project Meeting Agenda:

  1. Confirm all data migrated successfully
  2. Review key workflows and how they function
  3. Walk through the new UI/UX
  4. Confirm all third-party tools connected
  5. Review enablement materials and training recordings
  6. Set expectations for post-hypercare steady-state
  7. Discuss ongoing support model
  8. Make it explicit: "Project complete"

Documentation package delivered:

  • Field audit spreadsheets (per object) — what was mapped, transformed, or removed
  • Scoping documents — all Big Five architecture decisions
  • Third-party tool strategy one-pagers
  • Training recordings (end user + admin)
  • Workflow documentation — all automations built, including The Hits
  • Workback plan (final version)

For Single Project engagements: Walk the customer through the maintenance schedule in detail. Record a video walkthrough. Make sure they understand what to check, how often, and when to call LeanScale back.

Output: Customer owns the system. Project formally complete.


4d. Project Close

Purpose: Clean internal wrap-up + establish retention/expansion path.

Archive Checklist

  • All project artifacts saved to proper location
  • Field audits, scoping docs, and workback plan archived
  • Handoff documentation complete
  • Time/billing finalized
  • What went well?
  • What would we do differently?
  • Any learnings to feed back into the migration playbook?
  • Did the workback plan estimate hold? If not, where did scope expand?

Retention / Expansion

Two paths based on engagement type:

Engagement TypePath
Single ProjectUpsell → Downsell → Retry
Multi-Project (Dedicated)Schedule Refinement Check-In

Single Project Path:

1. Upsell: Managed Services (retainer)
↓ if no
2. Downsell: Adjacent one-time project
- Lead Lifecycle Design
- Attribution (full depth)
- Deduplication
- CPQ Implementation
↓ if yes
3. Retry retainer at end of next project cycle

Multi-Project (Dedicated) Path:

Schedule a refinement check-in ~1 quarter post-launch:

"On [date], we'll review how the Salesforce instance is performing and see if any adjustments are needed."


Deliverables & Assets Summary

Strategic Deliverables:

  • Scoping documents for all Big Five categories (Accounts, Opportunities, Contacts/Leads, Technology, Data Structure)
  • Architecture diagrams (Lucidchart) where applicable
  • Workback plan document (final version)
  • Third-party tool strategy one-pagers

Technical Deliverables:

  • Fully configured Salesforce instance:
    • All fields mapped and created per field audit decisions
    • All automations and workflows built (including The Hits)
    • Page layouts configured per object
    • User permissions set up
  • Data migration completed with historical data preserved
  • All third-party integrations connected and validated

Documentation Package:

  • Field audit spreadsheets (per object)
  • Training recordings (end user + admin)
  • Workflow documentation (all automations built)
  • Process change documentation (HubSpot → Salesforce differences)
  • Maintenance schedule

Appendix

What This Document Is

This is the implementation playbook — the step-by-step execution guide an Architect follows to deliver a HubSpot to Salesforce migration from first contact to project close. It follows LeanScale's 4-phase framework: Strategy, Engineering, Enablement, Handoff.

What Each Phase Produces

PhaseOutputGate Criteria
Phase 1: StrategySigned-off scoping package (Big Five decisions + workback plan)Client stakeholders have approved architecture decisions and timeline
Phase 2: EngineeringBuilt and tested Salesforce instanceQA checklist passed, data migrated, tools connected, cutover executed
Phase 3: EnablementTrained team with documentationAll training delivered, hypercare complete, team operating independently
Phase 4: HandoffIndependent customer + archived projectInternal/external handoffs complete, maintenance plan in place, project closed

How to Adapt Per Project Type

This project is Engineering-heavy:

Project ProfileStrategy WeightEngineering WeightEnablement WeightThis Project
Engineering-heavy10-20%60-80%10-20%HubSpot to Salesforce Migration

Adaptation for this project:

  • Phase 1 compresses into ~30 days of scoping (light relative to total project)
  • Phase 2 expands significantly with five parallel workstreams (field mapping, automations, layouts, data migration, integrations)
  • Phase 3 is standard — end user + admin training, 2-4 weeks hypercare
  • Phase 4 always applies — handoff and maintenance schedule

Migrations naturally expose adjacent project opportunities. These are identified during scoping or build but deferred to keep the migration on track:

  1. GTM Lifecycle / Lead Lifecycle Design — Basic lifecycle is part of the migration. Full redesign with operational depth = separate project.
  2. Deduplication — Basic cleanup during field audit. Deep dedup at scale = separate project.
  3. Attribution — Basic fields included in The Hits. Deep attribution = separate project.
  4. CPQ Implementation — HubSpot has native quoting, Salesforce doesn't. CPQ tool selection and implementation = separate project.
  5. Third-Party Tool Migrations — Each complex tool migration (ChurnZero, Salesloft with heavy config) can be its own mini-project.

References

[1] Johnny Grow - The CRM Failure Rate is 55% [2] Salesforce - Why Do CRM Projects Fail [3] Expert Allies - Why Hypercare Matters [4] KamelBPO - Hypercare Explained: Best Practices and Benefits